Deltona

DELTONA – Provided plant wide PLC Controls, Citect SCADA and fiber communications. Redundant networked Citect SCADA servers with client nodes and communications from the new main plant PLC to numerous vendor supplied packages using many divergent communications protocols including Ethernet, ControlNet, MODBUS TCP and MODBUS serial. Also included panel design and fabrication, PLC/SCADA programming, Instrumentation, …

Deltona Read More »

Punta Gorda

PUNTA GORDA – Provided complete I&C design and construction to implement a new reverse osmosis water treatment plant major headworks process and control systems.  This included providing new PLC control panels, instrumentation and fiber optic cable.  Provided new SCADA software on three new workstations.  Work included panel design, fabrication, instrumentation, PLC/SCADA programming, calibration, fiber testing, …

Punta Gorda Read More »

Rockledge

ROCKLEDGE – Provided complete design and construction implement whole plant automation of a partially automated WWTP. This included providing/installing three (3) new PLC control panels and installing conduit/wire to all field devices as well as fiber optic cable between existing and new PLC control panels and a new SCADA system. Provided a new SCADA System …

Rockledge Read More »

North Port

Project Engineer/PM for the complete I&C design and construction management of a ground-up water treatment plant in the West Villages that services 30,000 homes, industrial and commercial properties in the North Port Area. This project included the design of all major aspects of the I&C system which includes, the plant’s two primary control panels, major …

North Port Read More »

Hillsborough County

HILLSBOROUGH COUNTY – Instrumentation Project Engineer/Consultant for the Hillsborough County NWWRF Expansion from 10 to 30 MGD. Worked closely with the Garney/Wharton Joint Venture Design Build Team to produce the contract drawings and write specifications to deliver a product that will meet the wastewater treatment needs of the county until after 2040. The three year …

Hillsborough County Read More »

Largo WWRF

LARGO – Designed, constructed and programmed a two new control system for a new 10MGD SBR Waste Water Treatment Plant. This included three PLC control panels, four SCADA computers, a fiber Ethernet network and all instrumentation. Designed and implemented an automatic process reporting system

Homestead

HOMESTEAD – Designed, constructed and programmed a two new control system for a new 10MGD SBR Waste Water Treatment Plant. This included three PLC control panels, four SCADA computers, a fiber Ethernet network and all instrumentation. Designed and implemented an automatic process reporting system.

Haines City

HAINES CITY – Provided a complete Master Control Panel replacement. Removed in-place PLC-5 system and a installed ControlLogix System. Provided new remote I/O panel for new headworks structure.