CITY OF ROCKLEDGE WWTP SCADA PHASE 2

PROJECT COMPLETED:

October 2020

ROCKLEDGE – Provided complete design and construction implement whole plant automation of a partially automated WWTP. This included providing/installing three (3) new PLC control panels and installing conduit/wire to all field devices as well as fiber optic cable between existing and new PLC control panels and a new SCADA system. Provided a new SCADA System consisting of two new servers and a new network rack. Provided monthly DEP reports. Work included panel design, fabrication, installation. New instrumentation. Conduit/wire/fiber design and installation. PLC/SCADA programming, Instrumentation calibration, fiber testing, checkout/startup, as-built documentation and training.